29 November 2015
Those attending; Rob Mason More battening work for one day only!! One of the staff in C&W, Keith has helped cut and route some of the floor edging battening, which has helped hugely. Some really awkward pieces to cut and shape but all the pieces are now in place. There was one casualty, one of the window frames, the last one to be put in broke whilst being fixed in to place. That has now gone back to the workshop to be repaired. If you wish to lend a hand please contact David Jenkins |
Above : Keith from C&W woodwork shop helping us with cutting and routing the floor battening. © C15PS |
Above : The longest piece of floor battening in place. © C15PS |
Above : Door battening in place after restoration. © C15PS |