11 & 12 December 2015

Attendance - 2

Jim and Rob carried on with the various little jobs in the cab, including fitting the last window frame which is fresh back from repair and securing the last piece of floor battening in to place. The lads also stripped the paint off two Coughtrie bulkhead lamps and painted them up in hammerite silver. They are close to the original design so should look the part inside the cab. Further developments have seen 2 cab seats acquired from the good folk in Carriage and Wagon dept at the ELR.

If you wish to lend a hand please contact David Jenkins

Above : The bulkhead light as bought. © C15PS
Above : Stripped down and ready for shotblasting. © C15PS
Above : Last piece of floor battening secured. © C15PS
Above : Painted and back together. © C15PS
 

 

Fancy Getting Involved? click on the You Can Help page